Rent: $9.50/sf NNN
$1.39/sf of Nets including real estate taxes, insurance and water and storm water for Gross Rent of $3250
HVAC: (1) 140 K BTU gas heat and 5 ton 3 phase electric A/C gas ceiling unit
SUITE E IN 53,598 SF BUILDING
E: 3577 sf (500 sf office 2024, rest room 2025)
COULD BE COMBINED WITH SUITE B (6540 SF) AND/OR SUITE D (13814 SF)
DESCRIPTION: single story industrial facility
SIZE OF BUILDING: : 53,915 sf (224’ x 240) not including +-3000 sf mezzanine with direct access to rail siding served by freight elevator (out of service). Capacity of 104-120 truckloads in main warehouse area (43000 sf, approx. 2464 pallets double stacked).
CONSTRUCTION YEAR: 1919. Extensively renovated 2012.
CONSTRUCTION: Floor: 4000 sf new concrete dock poured in 2012 with 4 new roll up doors and drive in ramp. 6 floor drains in main warehouse area. Walls: brick and metal sash windows. Columns: Steel. Roof: modified bitumen over wooden deck. Entirely re roofed in 2011 with deck replacement where needed.
STORMWATER: $212,000 invested in storm water management system located under the dock floor with rerouted rain leaders. Geothermal heat tubes installed under storm water system for possible future use.
CEILING HEIGHTS: 15’ sloping to 14’ clear in main warehouse. 18’ Under the beam in loading areas. Section F of building is 10494 sf consisting of 7094 sf section which is 29’ under the beam and clear span and 3400 sf 14’ under the beam.
COLUMN SPACING: 26’6’’ x 35’3” in main warehouse. No columns in 29’ clear section which measures 44’ x 185’ or 7094 sf.
TAILGATE LOADING: for 4 tractor trailers (60’ Bay in tractor trailer dock) and one straight truck (31’ foot bay in straight truck dock)
DRIVE IN: 6 doors
FLOOR DRAINS: throughout
PARKING: rear, fenced lot as well as inside building via ramp or in dock area. Also curbside parking around building.
SPRINKLER SYSTEM: Throughout the entire building, supplied by (2) 6” mains (dry system). $75000 invested in 2021 in sprinkler riser room rebuilt with all new piping, Reliable Zero EX low pressure dry valves, compressor, switches, gauges and sensors. Certified by Cintas Fire Protection.
SPRINKLER ALARM: Silent Knight 5204 4-Zone Sprinkler Alarm Control Panel with communicator with flow, tamper and low air switches tied into the control panel. The system is monitored and certified by Kartman Fire Alarm Co.
SECURITY: BURGLAR ALARM: Honeywell Vista-128FBP Commercial Fire and Burglary Partitioned Security System installed 2011. 6150 Radio Frequency Keypad, Long range and regular motion detectors as well as wired windows and entry. Alarm connected to the horn strobes and outdoor siren when activated. Monitored by Kartman Security. CAMERA SYSTEM: $20,000 installation by Kartman in 2013 consisting of 8 high quality cameras into connected to an Everfocus networked DVR connected to the internet and visible over smart phones. WINDOWS: Rebar welded the length of casement windows to prevent entry and the windows facing the elevated rail tracks have been formed and filled with concrete. Roof along tracks is fenced with concertina wire and reinforced steel door from roof into warehouse.
HVAC: 4 ceiling mounted 250 K BTU natural gas hot air blowers in warehouse, 2 in Suite C and 2 in Suite D.
7 SEER Mitsubishi mini split heat pump unit in Suite A office installed 2013.
(1) 140 K BTU gas heat and 5 ton 3 phase electric A/C gas ceiling unit installed in Suite E. Window AC unit Suite F.
Interior Walls: Insulated and covered with house wrap
ELECTRICAL POWER: 2 PECO metered Services:
Service 1: 3 Phase 120/240 Volt 4 Wire 600 amp
Service 2: 1 Phase 120/240 Volt 3 Wire 200 amp
Metered Subpanels:
Suite B: 100 amp single phase installed 2019
Suite C: (1) 125 amp single phase installed 2015 and (1) 400 amp subpanel installed 2025
Suite D: (1) 100 amp three phase installed 2024
Suite E: (1) 100 amp three phase installed 2024
Suite F: (1) 200 amp and (1) 100 amp three phase installed 2018
INTERIOR LIGHTING: 19200 lumen 140 watt High Bay LED fixtures installed 2021.
WATER: 2” capacity, City of Philadelphia
SEWER: 8” capacity, City of Philadelphia.
GAS: 4” high pressure service provided by Philadelphia Gas Works.
ZONING: I-2 and C-1. allowing an extremely wide variety of light and heavy industrial and commercial uses
FORMER TENANTS: Parker Associates (container freight station), NBC Universal (millwork and production facility), Tioga Pipe (warehouse), Masland Duraleather (furniture factory)