FREIGHT LOADING OF SECOND FLOOR: Trap door pallet access to second floor from common loading dock in front of building and inside staging area through 5'x5' trap door opening for fork lifting to second floor. Owner provides and maintains common forklift with 3615# weight capacity at full extension which serves essentially as elevator to second floor. Owner provides a common hand pallet jack on second floor to move freight from trap door to demised area on second floor. The space is best suited to 40x48x110” palletized freight. Second floor has heavy loading capacity on account of wood plank flooring on concrete deck supported by steel columns. Office in photos available for extra charge of $500 per month.
TAILGATES FOR BUILDING: 5
LOT SIZE: 42,744 +/- sf or .94 +/- acres. Visible from I-95, Minutes from I95, Tacony and Betsy Ross Bridges
BUILDING: 5000-14,858 sf available on second floor
ZONING: Least Restricted Industrial, allowing an extremely wide variety of light and heavy industrial uses.
PARKING: 14 cars and 5 tractor trailers. Fenced parking lot with roll gate and drain repaved 2018, Concrete loading dock for 6 trailers.
DESCRIPTION: two story steel and masonry building. Former occupied by Quaker City Rubber Co, (manufacture of belts and hoses), Big 3 Manufacturing (cleaning product in pods), La Cantina (food distribution), Prestige Packaging (warehousing and fulfillment) and JNJ Manufacturing (manufacturing of wood case goods), and Cofco (distributor of commercial furniture).
REST ROOMS: Warehouse bathrooms in second floor constructed 2019.
CONSTRUCTION YEAR: 1919.
CONSTRUCTION: Walls: cinder block and brick on all four sides. 1st Floor: 6" concrete slab. 2nd Floor: wood plank flooring on concrete deck. Columns: Steel. Roof: four ply built up asphalt cover over concrete deck
CEILING HEIGHT: 14' clear.
COLUMN SPACING: 17.5'x20'
LOADING: Tailgate loading with 5 bays through (3) 16' x 11' steel roll-up doors. Dock bumpers and cushions. Also can access interior common staging area through roll-up drive in door.
SPRINKLER SYSTEM: Throughout the entire building, supplied by (2) 6" mains (dry system. Certified by Keystone Fire Protection.
SPRINKLER ALARM: Silent Knight 5204 4-Zone Fire Alarm Control Panel with communicator with flow, tamper and low pressure switches tied into the Control Panel. The system is monitored by Affiliated Alarm Monitoring. Certified by Kartman Fire Alarm Co.
BURGLAR ALARM: Installed 2013, door contacts and motion detectors monitored through cellular dialer monitored by Lydia Security Monitoring.
HOT WATER: 1 electric tanks.
ELECTRICAL POWER: PECO Y service (120/208/277/480 volts), 3 Phase, 400 AMP Service Panel. Installed 2005. 2 subpanels on 2nd floor and three on first floor.
HEATING: 2 Modine PDP Gas Blowers (250 k BTU's) on second floor. Installed in 2007.
AIR CONDITIONING: Second floor office, new Mitsubishi high efficiency mini split HVAC unit.
INTERIOR LIGHTING: casement interior and exterior windows on the second floor and T-5 fixtures which would be upgraded to LED's upon request.